Written with AI assistance and may contain mistakes. Verify against the official Transport Canada publications before relying on anything here.

PPL Tester

The 5 Ps check

5 Ps check: scheduled review of five variables shaping a flight, to catch risk in time to act (PHAK ch.2).

P Covers Detail
Plan Mission: cross-country planning, weather, route, fuel, publications currency Updated throughout flight. Delayed takeoff, fast-moving weather, short-notice TFR can change it
Plane Usual mechanical and cosmetic issues Advanced-avionics aircraft add: database currency, automation status, emergency backup systems
Pilot Pilot's own fitness, checked against IMSAFE Late nights, fatigue, sustained flight above 5,000 ft: less discerning, less critical of information, less decisive, more compliant and accepting, right as the most critical part of the flight arrives
Passengers Their need to make a connection or a meeting enters pilot's decision loop Give them tasks. Describe risk factually. Non-pilots may not read risk like a pilot. SRM means risk management, not risk elimination
Programming GPS, autopilot, electronic displays Cut workload but can hold attention for long stretches. Decide in advance when programming (approaches, route changes, airport information) is done and when not

Run the check at five scheduled points:

  1. Preflight
  2. Pretakeoff
  3. Hourly or at the midpoint of the flight
  4. Pre-descent
  5. Just prior to the final approach fix (VFR: just prior to entering the traffic pattern)

Trap: 5 Ps is one of three ADM frameworks in PHAK, alongside 3P model (PAVE, CARE, TEAM) and DECIDE. Same purpose, different framework.

References


Practice