Written with AI assistance and may contain mistakes. Verify against the official Transport Canada publications before relying on anything here.

PPL Tester

Levelling off: leading the altitude

Level-off starts before target altitude. Aircraft keeps climbing or descending (at decreasing rate) through transition: waiting for target overshoots.

Rule (TP 1102): lead altitude by 10 percent of vertical speed shown on VSI.

Phase Begin level-off
Climbing Below target, by lead amount
Descending Above target, by lead amount

At lead point: adjust attitude (and power, on a descent) to stop altimeter at desired altitude, then trim.

Trap: holding pitch until altimeter reads target overshoots every time; higher vertical speed, bigger overshoot.

References


Practice