Written with AI assistance and may contain mistakes. Verify against the official Transport Canada publications before relying on anything here.

PPL Tester

Amending a filed flight plan or itinerary

An amendment is a change to a filed flight plan or itinerary, before departure or en route. Closing is a separate report.

VFR (CAR 602.76(3)-(4)) IFR (CAR 602.76(1)-(2))
Changes that trigger Route, duration, destination aerodrome Cruising altitude/flight level, route, destination, TAS by 5% or more of filed, Mach by 0.01 or more of ATC-cleared
Notify ATS unit, community aerodrome radio station, or responsible person ATC unit or responsible person
When As soon as practicable As soon as practicable
Clearance Never, any airspace Required before the change if in controlled airspace

Diverting (TP 1102, Advise Others):

Landed, no emergency (TC AIM SAR 3.4):

Trap: VFR change = notify only, never clearance; IFR notify-only outside controlled airspace is not enough inside it.

References


Practice