Written with AI assistance and may contain mistakes. Verify against the official Transport Canada publications before relying on anything here.

PPL Tester

Maintenance schedule

A maintenance schedule sets the inspection interval an aircraft must follow.

Approval (CAR 605.86(1)(b); TC AIM LRA 5.6.2; Standard 625 Appendix B(6)):

Aircraft Approval
CAR 605.86(1)(b) aircraft: Subpart 6 of Part IV or Part VII operations, large, turbine-powered pressurized, airship Minister approval required, these aircraft only
Owners of non-commercial small aircraft and balloons using Appendix B plus C Deemed approved; owner makes technical-record entry only

Schedule by aircraft and operation:

Aircraft Operation Schedule Interval
Small aircraft (excl. pressurized turbine and balloons) Non-commercial Appendix B Part I, plus Appendix C 12 months
Balloon Non-commercial Appendix B Part II, plus Appendix C 12 months
Small aircraft Commercial Appendix D approved program, may be based on Appendix B Part I, plus Appendix C Part I basis: 100 hours or 12 months, whichever comes first
Balloon Commercial Appendix B Part II, plus Appendix C 100 hours
Large aircraft, pressurized turbine aircraft, airships, flight-training-unit or Part VII operations Commercial or not Appendix D approved program, including applicable Appendix C items -

Appendix B (Standard 625 Appendix B(1)):

Timing: times between maintenance activities count air time only, not total flight time (Standard 625.93(1)). Air time is defined in Flight time definitions.

Changing schedules:

Trap: deviation needs a written safety case to the Minister; switching needs an inspection plus re-established times remaining; neither is automatic or by technical-record entry alone.

References


Practice