Diverting to an alternate destination
A diversion = destination changed in flight (e.g. deteriorating weather, sick passenger, aircraft problem).
Steps:
- Choose alternate: suitable destination, suitable distance, suitable terrain.
- Line feature leads there (road, powerline, railroad, river, shoreline): follow it. Simplest, recommended.
- No usable line feature: draw free-hand track line. Break long diversion into shorter legs.
- Start from a known fix: positively identified point, not an estimated position.
- Estimate heading (TP 1102, Estimate Heading):
- Many pilots assume track = heading, set it, then apply drift compensation method once established.
- Wind already known strong: estimate and apply drift correction up front, adjust as needed.
- Recompute once established: note time, use nearest winds aloft for new heading and ground speed, then arrival time and fuel consumption (TP 1102 log: new ground speeds, revised ETAs; PHAK ch.16).
- Arrive at alternate (TP 1102 Low Level Navigation):
- Do not interfere with other traffic.
- Alternate in Control Zone: normal zone-entry requirements and procedures.
- Uncontrolled airport: correct circuit-joining procedure.
Emergency (PHAK ch.16): divert promptly. Turn toward alternate first. Full plot, measurement and computation before turning only prolongs it.
Trap: diverting without telling ATC (or responsible person) the new destination: any search still targets the original filed route.
References
- TP 1102 Pilot Navigation, Diverting to an Alternate Destination; Estimate Heading; Set Heading
- FAA-H-8083-25 PHAK ch.16, Flight Diversion
- TP 1102 Pilot Navigation, Low Level Navigation